For this project, AE Architecture worked with TAV Construction group for the additional terminal building with an area of 10.000 m². The additional terminal building is constructed by doubling the basement floor of the existing cargo building. The structure, which is a roof space cage system, is planned as reinforced concrete and steel system.
The bridge and the passengers at the exit of the additional terminal building are connected to the additional scaffolding building after the security check.